New construction of the largest beachfront indoor waterpark, and one of the largest Open-Air Greenhouse structures in the country at 120,000 square feet. The project scope included significant sitework to construct the polycarbonate superstructure, as well as the associated mechanical and water systems. This included an initial 1,000 cubic yard concrete pour which took 7 hours to complete. The facility houses 11 water slides, 6 bars, a 6,500 foot lazy river, a wave simulator, boardwalk area, adult-only zone, and several additional areas. The project was completed on a fast-track schedule, with acceleration to meet the summer season.
Location: Atlantic City, NJ
Owner: Tower Investments
Architect: SOSH Architects
Size: 120,000 sf